Use Cases

Bottleneck analysis Prioritization of resources Buffer sizing Capacity calculations Concept Validation Supplier Comparison Sequence optimization
  • What will be the throughput/h of the new production system?
  • How does the throughput/h change if the cycle time is reduced by 10% in station 3?
  • Which of these two scenarios gives the highest throughput/h?
  • How should the buffer places be distributed to maximize the throughput/h?
  • How many buffer zones are needed to reach a throughputof 60 parts/h?
  • Which station is the bottleneck in the system?
  • Which action provides the greatest impact on the throughput/h?
  • Which of these systemsis most profitable?